01 · Garages
Full-Flake
Vinyl flake to full coverage under UV-stable polyaspartic. Hides dust, grips wet feet, shrugs off hot tires.
South Florida · Open 24/7
Flake, metallic and quartz epoxy. Diamond-ground, moisture-tested and sealed under UV-stable polyaspartic. Built for Miami slabs. Finished like a showroom.
Call or text, same number. Free on-site quote.
1 day
Most garages
12
Service areas
24/7
On call
Real Miami floors. Drag to swirl the resin.
Free on-site estimate
Takes 30 seconds. We text you back within the hour.
The Problem
HUMIDITY
Moisture pushes up through South Florida slabs all year. Roll a DIY kit over that and it bubbles, peels and lifts under hot tires inside a year.
So we never skip the boring part. Every floor starts with a moisture reading and a real diamond grind, and ends under polyaspartic that won't amber in the sun.
100%
of slabs moisture-tested before a drop of epoxy is mixed
0
acid-etch shortcuts. Diamond grinding only, every job
48-72h
from grind to parking on a finished, cured floor
How It's Built
5 LAYERS
Press play and a real garage system comes apart, from the ground concrete up. Every layer has a job.
Coating build
0mils
About 30 mils all in. Roughly the thickness of a credit card.
The Finishes
SYSTEMS
Every system gets the same prep: moisture test, diamond grind, crack repair. What changes is the look on top.
01 · Garages
Vinyl flake to full coverage under UV-stable polyaspartic. Hides dust, grips wet feet, shrugs off hot tires.
02 · Statement
Pigment moved through self-leveling resin by hand. Every pour is one of one.
03 · Wet zones
Slip-rated double-broadcast quartz, or seamless single-color epoxy that mops clean in minutes.
04 · Business
High-build systems for shops, salons and showrooms. Installed nights and weekends so you never close.
The Work
ROOM TOUR
Tap the photo to pour in the next room, swipe, or pick a thumbnail. It tours on its own too.
The Process
ONE DAY
We walk the slab and test moisture, the #1 reason coatings fail here. You get a fixed written quote on the spot.
The concrete is ground open and every crack repaired, so the coating bonds into the slab, not onto it.
Moisture-tolerant primer, then your body coat: flake, metallic, quartz or solid, at full thickness for your traffic.
UV-stable, chemical-resistant clear. Walk on it next morning, park in 48-72 hours. We leave it cleaner than we found it.

"Boring prep is the whole job. The shine is the easy part."
Book a free moisture testMost two-car garages are ground, coated and topcoated in one day. Walk on it the next morning, park on it in 48-72 hours.
Every slab is different, so we price it in person. We measure, moisture-test the concrete and hand you a fixed written quote on the spot. The visit is free.
Old paint and failed coatings get ground off completely during prep. Coating over them is how floors peel, so we don't do it.
Flake and quartz systems have built-in texture, and we can add anti-slip grit to any topcoat. It is standard on pool decks and entries.
Yes. Every slab is moisture-tested first, primed with a moisture-tolerant primer and finished with a UV-stable polyaspartic topcoat that won't amber in the sun.
Your floor
Takes 30 seconds. We come out, moisture-test the slab and put a fixed price in writing.